BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Normal, Illinois. Completed plans call for the renovation of a municipal facility.

1. Clean the existing metal roof surface of debris and moisture. 2. Fill the cavity profile or flute of the existing metal roof by loosely installing rigid premium Expanded Polystyrene (EPS) insulation. The insulation should accurately fit (depth and width) in between each rib of the roof surface. 3. Mechanical steel-coated load fasteners and plates should be utilized to secure a specifically designed cover board atop the Expanded Polystyrene Foam (EPS) and the existing metal roof. The cover board should be a rigid roof insulation panel composed of high-density, closed-cell polyisocyanurate foam core bonded to a premium performance coated glass facer (CGF). The drill point of the fastener threads should engage firmly into the standing seam of the metal roof. 4. Adhere the TPO (Thermoplastic Polyolefin) membrane per the manufacturers specifications, White - 60 mil. The TPO membrane should be attached with mechanical fasteners. A hot air welder and pressure roller should be used to heat and fuse the membrane sections together to form a watertight seam. 5. The roof assembly must work as a system. Any component of the roof assembly demonstrating an inherent weakness or inability to perform will diminish the roof system performance and service life expected. Roof membranes and other components should conform to ASTM product standards, if available. 6. All roof perimeters and penetrations should be flashed per TPO installation specifications. Install a pre-finished metal edge where needed. 7. The existing roof gutter and downspouts will remain. 8. Provide a minimum 15-year manufacturer warranty Project Description: Install a TPO (thermoplastic polyolefin) single-ply roof membrane to the Linden Street Barn low-slope metal roof. All written questions may be submitted Thursday, August 10, 2023, and continuing through Monday, August 21, 2023. The Town of Normal reserves the right to reject any or all bids received. Further, the Town has the right to waive any informality or technicality in bids received when in the Town's best interest. Contract award Tuesday, September 5, 2023

Post-Bid

Municipal

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
60
Bidding Soon
990
All Active Projects
435
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 25, 2023

September 25, 2023

img_map_placeholder

617 S Linden St, Normal, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.