Published November 10, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Holderness, New Hampshire. Design plans call for the renovation of a educational facility.

As of November 10, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in May 2024 be completed by summer 2025. *The closed solicitation has been included below for reference: Project Site: Physical Education Center (PE Center) Fieldhouse Rd Holderness, New Hampshire The design program will incorporate three (3) prioritized elements: 1. Replacement of existing steam boiler system. 2. Upgrade and installation of ventilation system 3. Installation of air conditioning. PSU will not have the available budget to complete all three (3) priorities. Therefore, we are seeking the following for each design element: Boiler Replacement: The proposal will include full design and construction administration services for the boiler replacement project. USNH will be engaging a construction manager to provide preconstruction services, which will include cost estimating. PSU engaged RFS Engineers to review the systema and provide recommendations regarding replacement or upgrade. This report is included in this RFP. Ventilation System: The proposal will include full Schematic Design elements, which will allow the Construction Manager (CM) to provide pricing for PSU to seek funding sources. Working with the CM will also include identification of long lead components and integration with the boiler replacement project. Air Conditioning: The proposal will include full Schematic Design elements, which will allow the Construction Manager (CM) to provide pricing for PSU to seek funding sources. Working with the CM will also include identification of long lead components and integration with the boiler replacement project. Coordinating with PSU staff the project team will identify areas where air conditioning will be installed. The project design phase is anticipated to be from September 2023 - February 2024; Phase 1 construction May 2024 July 2024. Depending on equipment lead times and subject to negotiation. It is intended that all work is complete by summer 2025. The anticipated construction budget for all design work and construction of the boiler system is four point five ($4.5 M) million The anticipated construction budget is $15M. The method of Contractor Selection has not been Determined at this time. Question Deadline 08/24/2023 at 12:00 PM ET

Design

Educational

$15,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
97
Bidding Soon
1,350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

Project location map

Fieldhouse Rd, Holderness, NH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.