BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Columbus, Ohio. Contact the soliciting agency for additional information.

The Ohio State University Wexner Medical Center is requesting qualifications from interested A/E teams to complete a feasibility study to assist in the validation of the fit plan for a PET Cyclotron in the ground floor of the Brain & Spine Hospital (BSH). A fit plan has been completed by OSU WMC Planning which will be shared with the short-listed teams for reference. This study will determine the scope of work and budget for renovation work that will be designed and constructed following study completion. This is a request to study the feasibility of installing a PET Cyclotron and associated support rooms in approximately 10,000 SF of the ground floor of the Brain & Spine Hospital. The space is currently radiology oncology and neuro oncology space and will be renovated to accommodate the required space for the cyclotron manufacturing and support, nuclear medicine and pharmacy, and a theranostic clinic. The interested A/E team will include architectural, MEP, and structural services to complete a study to determine the feasibility of this installation, as well as subsequent costs to accommodate the renovation. The successful A/E team will collaborate with OSU WMC cyclotron vendor while completing the study. A high level of competence for highly technical projects will be important. The contract will be issued through Program Verification only. Upon completion of the feasibility study, the contract may be amended to include Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Interested A/E firms shall assemble their proposals to demonstrate their capabilities in the feasibility study as well as the full project. Upon completion of the feasibility study, the project delivery will be CM-R. The successful A/E will assist with the selection of the Contractor as part of the feasibility study.

Conceptual

Educational

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
54
Bidding Soon
1,135
All Active Projects
489
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2024

img_map_placeholder

300 W 10th Ave, Columbus, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.