BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 6, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Eagle Butte, South Dakota. Completed plans call for the renovation of a educational facility; and religious / funeral development.

Period of : 09/11/2023 to 11/30/2023 The Contractor will then install a new turn-key video system with a drop-down screen and a Line-Array Sound system with 2 sets of Bose speakers on each side of the stage opening with wireless microphone capability. The contractor will upgrade and fix the issues we are experiencing with the gymnasium sound system. The contractor must use well-known, common, made-in-America equipment. Place of Cheyenne-Eagle Butte School 2004 E Street Eagle Butte, SD - 57625

Post-Bid

Educational

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
6
Bidding Soon
89
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2023

September 11, 2023

Project location map

2004 E St, Eagle Butte, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.