Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2023 at 8:00 PM

Updated January 29, 2024

Site work for a mixed-use development in Mabel Lake, British Columbia. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The RDNO requires the services of a qualified contractor to provide channel rehabilitation works at Silver Star Ridge Subdivision. Schedule 'A' Services The Contractor will perform all Services as required for the following ; Construction Layout survey within RDNO Rights-of-Way; Rechannelization of multiple overland flow paths; Removal and disposal of damaged existing Geoweb as determined by the consultant onsite; Supply and install new Geoweb and class 10 riprap; Supply and install 750mm CSP culvert; Resurfacing of existing gravel access road;

Post-Bid

Water / Sewer

$250,000.00

Public - County

Site Work

5

10

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
12
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

October 11, 2023

Project location map

Silver Star Resort, Mabel Lake, BC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed