BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Wallace, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Contract Award Date: Jan 26, 2024 Contract Award Number: 69056724C000007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JCECLVHFMJS3 Contractor Awarded Name: GENESIS DESIGN AND DEVELOPMENT, LLC Contractor Awarded Address: Rio Rancho, NM 87144 USA Base and All Options Value (Total Contract Value): $2,034,530.00 General and Technical Questions Regarding Proposed Work for This Project Will Be Accepted Until Close-of-business on 10/05/2023. General . The project work is located 22 miles east of Couer D'Alene, Idaho. in Shoshone County. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are LAT 1096906.751', LONG 2959237.041' ESTIMATED PRICE RANGE. The price range of the project work is between $700,000 and $2,000,000. visits may be arranged during normal duty hours by contacting: There will be no government arranged visits. The is readily available for inspection. Prospective offerors are encouraged to make their own arrangements to inspect the . The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/08/2024 subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 06/10/2024. The completion date will be extended by the number of calendar days after the above date that the contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the contractor to execute the contract and give the required and bonds within the time specified in the offer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$2,034,530.00

Public - Federal

Paving, Site Work

41

14

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
1
Bidding Soon
106
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2023

June 10, 2024

img_map_placeholder

Prichard Creek Rd & Coeur D'Alene River Rd, Wallace, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.