BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Site work and new construction of a swimming pool in Mahone Bay, Nova Scotia. Conceptual plans call for site work for a swimming pool; and for the construction of a swimming pool.

Construction of a new community pool to replace the current facility within the Jubilee Park. Method of delivery may be Design-Build. TIMELINE: A fundraising campaign is currently underway. Scope of work, project delivery method, and timelines for tender and construction may be confirmed by mid-2025. *Budget is unreleased.

Conceptual

Swimming Pools

$4,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
40
Bidding Soon
507
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2026

Project location map

6 Pond St, Mahone Bay, NS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.