Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Site work and new construction of a swimming pool in Mahone Bay, Nova Scotia. Conceptual plans call for site work for a swimming pool; and for the construction of a 5,155-square-foot, one-story above grade swimming pool.

Construction of a new community pool to replace the current facility within the Jubilee Park. Method of delivery may be Design-Build. TIMELINE: Preliminary design was completed in 2024. A fundraising campaign is currently underway. Scope of work, project delivery method, and timelines for tender and construction may be confirmed by mid-2026.

Conceptual

Swimming Pools

$4,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
45
Bidding Soon
464
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2027

Project location map

6 Pond St, Mahone Bay, NS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed