Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a conference / convention center in Columbus, Ohio. Working plans call for the renovation of a conference / convention center.
As of May 18, 2024, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The FMC Zone A Air Handler Replacement project is aimed at modernizing and optimizing our facility to ensure a healthier, safer, and more sustainable environment. This project encompasses several vital components. First, the replacement of seven aging air handlers, which have been in service for over three decades, is a key goal. This replacement aims to yield benefits such as enhanced energy efficiency, improved indoor air quality, and decreased maintenance expenses. Additionally, there is a focus on infection control measures involving the integration of HEPA filters and ionization technology into all new air handling units. This initiative seeks to counteract the dissemination of infectious diseases and allergens within the facility, thereby promoting the well-being of occupants. Furthermore, this project involves the installation of water softeners. This installation is intended to safeguard plumbing and equipment against the detrimental impacts of hard water. The benefits encompass an extended lifespan for appliances and plumbing fixtures, lowered maintenance costs, and an overall improvement in water quality. Lastly, the project undertakes the assessment of the methane pump system. The primary objective is to evaluate the system's condition and performance. To bolster efficiency and safety, the methane pump system will be integrated into the existing Building Automation System (BAS) to enable real-time monitoring and alerts. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements and clarify the program of requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. Submit all questions regarding this RFQ in writing to Nichole Burns at drc.camsrfq@odrc.state.oh.us with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website on a regular basis until one week before the response deadline.
Final Planning
Conference / Convention Centers
$2,975,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
November 1, 2024
May 31, 2025
1990 Harmon Ave, Columbus, OH
Related To This Project
Columbus, OH
Bid Date: Sep 19 2023
Columbus, OH
Bid Date: Sep 01 2023
Columbus, OH
--
Columbus, OH
Bid Date: Aug 30 2023
Columbus, OH
--
Columbus, OH
Bid Date: Sep 08 2023
Columbus, OH
--
Columbus, OH
Bid Date: Sep 27 2023
Columbus, OH
Bid Date: Sep 21 2023
Columbus, OH
--
Columbus, OH
--
Columbus, OH
Bid Date: Sep 14 2023
Columbus, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--