BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Santa Barbara, California. Working plans call for the renovation of a water / sewer project.

**As of September 15, 2023, no bids received. No definite date for the rebid.** The purpose of this Project is to restore the damaged Toro Canyon Oil Seep Containment System (System) and to protect and improve the resiliency of the System to fires, flooding, and debris flows to reduce the potential for future oil release and protect residents, habitat, wildlife, and receiving water quality. The Central Coast Regional Water Quality Control Board (Central Coast Water Board) understands that the Project includes the following activities: 1. Replacement of the Oil Water Separator (OWS) within the existing fenced limits. A new fenced enclosure will also be constructed around the OWS. 2. Installment of an overflow weir to prevent high water from entering the OWS system including a weir box inflow and outflow pipe 3. Construction of a concrete debris protection wall on the west and south sides of the OWS. 4. Replacement of the existing underground oil pipeline with a new pipe compatible for the conveyance of crude oil, three linear feet of which will be buried within the channel. 5. Construction of a concrete low-flow channel crossing with supporting downgradient grouted riprap apron to protect the new buried oil pipeline and provide access to the OWS system. 6. Removal and closure of the existing underground storage tank (UST), which includes emptying, cleaning, and removing the UST. Additionally, this process will form the new foundation for an Above-Ground Storage Tank (AST). 7. Installment of a new 5,000-gallon AST inside a concrete enclosure Q&A Deadline 09/06/2023 2:00 PM (PDT) Replacement of an oil-water separator system. Project site is located on private properties and is not accessible to the public. Liquidated Damages $1,500 / day Project Duration 60 days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Final Planning

Water / Sewer

$1,473,000.00

Public - County

Renovation

19

8

15

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
23
Bidding Soon
558
All Active Projects
206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

March 15, 2024

img_map_placeholder

To Be Determined, Santa Barbara, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.