BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work and paving for a mixed-use development in North Fork, California. Completed plans call for the demolition of a road / highway; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Submit RFI's via email to derek.lavey@usda.gov by 1700 MDT 9/4/2023 The Sierra National Forest- Bass Lake Ranger District has the following construction requirements: Repair the parking lot at the Willow Creek Trailhead clearing and demolition of the brokenasphalt section and removal of stumps, downedtrees, and debris, placement and compaction of fill material, grading and pavement of the newasphalt section installing car stops, and installing riprap at inlet/outlet of an existing culvert; Repair the parking lot at the Recreation Point Group Picnic clearing and demolition of the broken asphalt section and removal of stumps, downed trees, and debris, grading and pavement of the new asphalt section, and installing car stop; Restore drainage function at the Forks Campground cleaning out two existing culverts and installing riprap at inlet/outlet; Repair the road section and restore drainage flow at the Spring Cove Campground clearing and demolition of the broken asphalt section and removal of stumps, downed trees, and debris, placement and compaction of fill material, grading and pavement of the new asphalt section, and cleaning out an existing culvert and installing riprap at inlet/outlet; Repair the road and trail sections and restore drainage flow at Dry Gulch Campground clearing and demolition of the broken asphalt sections of the parking lot and trail and removal of stumps, downed trees, and debris, placement and compaction of fill material, grading and pavement of the new asphalt sections at parking lot and trails, installing bulletin board, and cleaning out an existing culvert and installing riprap at inlet/outlet; and implement all other aspects shown on the project plans. Deadline 09/04/2023 at 4:00 PM PT email to derek.lavey@usda.gov by *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$400,000.00

Public - Federal

Demolition, Paving, Site Work

10

7

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
46
Bidding Soon
521
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

October 13, 2023

Project location map

To Be Determined, North Fork, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.