BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Stickney, Illinois. Completed plans call for paving for a sidewalk / parking lot; for site work for a water / sewer project; sidewalk / parking lot; and for the renovation of a water / sewer project.

Description 1. Rehabilitate Ten Biosolids Digestion Tanks (Digesters 1 through 10). Work includes pump out contents; spray down concrete walls and steel items; replace steel digester gas draw-off and sludge inlet pipes; provide new steel pipe supports; create concrete tank wall openings for new pipe sleeves; apply protective coatings to steel items and to the steel plates forming the top of the digester cover and all steel items above the digester covers; provide stainless sediment tanks and stainless pipe; and replace flow meters. 2. Rehabilitate Two Biosolids Digestion Tanks (Digesters 11 through 12). Work includes pump out contents; spray down concrete walls and steel items; and apply protective coatings to digester covers and all steel items above digester covers. 3. Reconfigure West Digesters Control Building (WDCB) West Digesters Chambers A, B and C, and tunnel connecting the WDCB to the Office, Shop, and Storage Building (OSS). Work includes but not limited to the following: modify buildings' interior and exterior as well as HVAC systems as required. Detailed work includes perform door expansions and repairs; modify interior CMU walls to be permanent gastight walls; reconfigure exterior brick walls; relocate and upgrade HVAC and plumbing; install wall sealants, new showers, and new flooring; install interlocking doors; replace the building roof, adjust the site grading; repair brick wall tuckpointing; construct sidewalks, awnings, and neutralize and demolish the 20" overhead abandoned steel gas pipe. 4. Replace or update all electrical equipment, conduits, and appurtenances per NFPA 820 Class 1, Division 1 requirements in work affected areas. The estimated cost of the work under Contract 18-148-3P is between $34,156,300.00 and $41,347,100.00.

Bid Results

Water / Sewer

$52,360,000.00

Public - County

Paving, Renovation, Site Work

369

21

52

9

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
89
Bidding Soon
1,781
All Active Projects
774
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

December 11, 2023

img_map_placeholder

Multiple Locations, Stickney, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.