BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2024 at 7:00 PM

Updated February 8, 2024

Renovation of a fire / police facility in Union, Missouri. Completed plans call for the renovation of a fire / police facility.

As of October 6, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. Franklin County is soliciting bids from qualified vendors to replace the existing metal roof with a new metal roof and add insulation and gutters to the Elliott Building at the Franklin County Sheriffs Office. This Contractor shall arrange, schedule, and organize as it pertains to this scope of work. 2. Construction work shall only be allowed during the following hours: 7AM 4PM (Monday through Friday) Any time outside these hours needs to be pre-approved by the Sheriff and/or a Sheriff appointed staff member to handle this project. A list of county holidays is attached. (See attached list) 3. Contractor to remove existing Metal roof. Approximately 40' by 100' in size. 4. Contractor will need to remove existing roof vents. 5. Contractor will remove all existing roof insulation, gutters, and downspouts. Contractor will install the following: -Metal Roof -Ridge Cap -Rake Trim -Foam Closures -Roof Insulation at a minimum of 4 inches thick -Gutters -Downspouts 7. Include cleanup of all rubbish and debris on a daily basis to an area designated by FCSO. Disposal of debris will be at the expense of the vendor. 8. The Color of the material will need to be approved with FCSO Facilities Director, Bill Barnes. 9. All start-up, labor, tools, equipment, materials and supervision to complete the work. 10.Coordinate all work with the Sheriff's maintenance director at FCSO, Bill Barns. 11.Include cold and hot weather protection as required to maintain the project schedule. 12.It is the County expectation that the Contractor will hold appropriate licenses/certifications for trade. 13.Contractor to provide a timeline from awarding of the bid to completion of the installation. County understands that the weather could effect this timeline. Any and all damage caused by the contactor to the facility and/or property will be at the Contractor's expense to repair and/or replace. 15. Pre-bid meeting, site visit to the location of the building is mandatory. See dates above. 16. See Insurance requirements.

Award

Fire / Police

$46,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
107
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

October 23, 2023

Project location map

1 Bruns Ln, Union, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.