Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Union, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
N. Christina Avenue Bridge. Includes complete removal and replacement of the bridge on N. Christina Avenue over Flat Creek in the City of Union, Missouri. The project includes construction of the bridge, a 30' concrete slab span on concrete wall abutments. The project also includes construction of the approach roadway embankments and pavements, sidewalks, pavement striping, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Memorial Parkway Bridge. Includes the removal of the existing bridge over Flat Creek on Memorial Drive, construction of a new bridge, sidewalks, approach slabs, curb and gutter, asphalt pavement, pavement striping, guard rail, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. The City of Union anticipates issuing notice to proceed in the Summer of 2019. A Bid Security in the Amount of Five Percent (5%) of the Bid Amount Must Accompany Each Bid, in Accordance With the Instructions to Bidders. For a Contractor to Be Awarded This Project the Contractor Must Have a Fully Responsive Contractor Questionnaire on File With the Missouri Highway and Transportation Commission at Least 7 Days Prior to the Bid Opening Date. All Bidders Must Be on Modot's Qualified Contractor List Per Section 102.2 of the Current Missouri Standard Specifications for Highway Construction. No Second Tier Subcontracting Will Be Allowed. The Wage Rates Applicable to This Project Have Been Predetermined as Required by Law and Are Set Forth in This Specification. When Federal Wage Rates Are Applicable and Included, This Contract Is Subject to the "work Hours Act of 1962", (P.l. 87-581: 76 Stat. 357) and Implementing Regulations. When State and Federal Wage Rates Are Both Required the Higher of the Two for Each Job Classification Shall Be Used. Effective January 1, 2009 and Pursuant to Rsmo 285.530 (1), No Business Entity or Employer Shall Knowingly Employ, Hire for Employment, or Continue to Employ an Unauthorized Alien to Perform Work Within the State of Missouri. The Successful Bidder Must Submit a Sworn Affidavit and Documentation Affirming the Business Entity's Enrollment and Participation in the Federal Work Authorization Program and That All of Its Employees Working for the Contracted Services Are Not Illegal Immigrants. Upon Signing the Contract, the Successful Contractor and Any Subcontractor Performing the Work Shall Provide a Tenhour Occupational Safety and Health Administration (Osha) Construction Safety Program for Their on-site Employees Within Sixty (60) Days of Beginning Work on the Construction Project. N. Christina Avenue Bridge Replacement City of Union, Missouri Memorial Parkway Bridge Replacement Sc15-548 & Sc16-541 Inv - 2 the City of Union, Missouri Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Businesses Owned and Controlled by Socially and Economically Disadvantaged Individuals Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Dbe Contract Goal for This Project Is 14%, and Dbe Firms Must Be Certified by Modot to Attain Credit Towards This Contract Goal. The Number of Trainee Hours Provided Under This Contract Will Be 1 Slot at 1000 Hours Per Slot or 1000 Hours. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder. The Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner With Modot's Consent.
Award
Bridges / Tunnels
$1,670,373.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2019
June 20, 2019
N Christina Ave, Union, MO
Related To This Project
Union, MO
Bid Date: Oct 13 2023
Union, MO
Bid Date: Oct 13 2023
Union, MO
Bid Date: Oct 13 2023
Union, MO
--
Union, MO
Bid Date: Oct 13 2023
Union, MO
Bid Date: Oct 11 2023
Union, MO
Bid Date: Nov 14 2023
Union, MO
Bid Date: Jan 12 2022
Union, MO
Bid Date: Mar 02 2022
Union, MO
Bid Date: Feb 02 2022
Union, MO
--
Union, MO
Bid Date: Sep 21 2023
Union, MO
Bid Date: Aug 31 2023
Union, MO
Bid Date: Aug 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.