BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Muncho Lake, British Columbia. Completed plans call for site work for a road / highway.

This is the Phase 2 solicitation following an Invitation to Qualify. Only qualified suppliers have been invited to bid. Work to be performed along the section of Alaska Highway between km 700 and km 704 (east side of Muncho Lake) in accordance with the project drawings includes: 1. Installation of about 12,240 m2 of rock fall attenuation mesh including all necessary anchors; 2. Scaling of about 500 m2 between km 700+000 and km 700+450 in areas identified on the project drawings. 3. Scaling of rock cut between km 701+000 and km 702+250 where rockfall attenuation mesh is to be installed to ensure worker safety. 4. Removal and disposal of all material generated during scaling. 5. Removal of trees near the crest of the rock cut which may pose a risk to highway remove rock cut. 6. Provision of site trailer and washroom facilities as well as electricity and internet. 7. Maintaining and cleaning of site to return roadway, ditches, shoulders, etc. to the condition at the beginning of the project. 8. The above work is expected to be completed in no more than 30 days. Work to be performed along the section of Alaska Highway between km 255 and km 256 (Sikanni Hill) in accordance with the project drawings includes: 1. Scaling of rock face in areas identified on the project drawings or as per the instruction of the departmental representative between km 255 and km 256. 2. Scaling of rock cut between km 255 and km 256 where rockfall attenuation mesh is to be installed to ensure worker safety. 3. Installation of up to about 1,350 m2 of rock fall attenuation mesh as needed due to removal during scaling or damage to existing mesh including all necessary anchors. 4. Drilling of approximately 50 m of drain holes at locations specified on drawings. The scope of work at Muncho Lake (km 700 to km 704) is expected to commence September 2023 and be completed prior to October 2023. The scope of work at Sikanni Hill (km 255 to km 256) is anticipated to be completed following the work at Muncho Lake at the direction of the Departmental Representative either immediately following the work at Muncho Lake or during the following Construction Season (2024) and be completed prior to October 2024. Location: Muncho Lake and Sikanni Hill Rockfall Mitigation, Km 255-256 and Km 700-704 of the Alaska Highway (Highway 97) in Northern British Columbia Please contact the contracting officer to get the full solicitation documentation, access information on how to bid, or if you have any questions regarding this tender opportunity.

Award

Roads / Highways

$3,716,265.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

November 1, 2023

Project location map

Multiple Locations, Muncho Lake, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.