BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a civil project in Savannah, Missouri. Completed plans call for site work for a road / highway.

The work to be completed consists of water distribution system improvements, piping, soil, work, surface repairs, road bores, system connections, service connections, service reconnection, and all necessary appurtenances. The construction crew shall keep thorough as-built drawings for Owner use. The daily log sheet contained in the Appendix shall be used to help keep as-built drawings. The Owner shall update the Master Plan and specifications as necessary and as required by the Missouri Department of Natural Resources

Award

Water / Sewer

$513,000.00

Public - County

Site Work

10

9

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
74
Bidding Soon
1,088
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

December 12, 2023

Project location map

Highway 59, Savannah, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.