BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

Site work and outdoor lighting for a mixed-use development in Jacksonville, Florida. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

District II (Cedar Bay) Water Reclamation Facility (WRF) New Plant Entrance Construction (this "Solicitation") is to select a supplier to provide construction services for a new entrance driveway for District II (Cedar Bay) WRF in Jacksonville, FL as described in this Solicitation (the "Work") and to determine the best method for JEA to procure the Work with regard to pricing, quality, and workmanship. This new entrance will provide access to Cedar Bay WRF through Imerson Industrial Complex. The contract will include a new driveway, security gate, cameras, badge readers, street lighting, and a new entry monument. Construction shall meet all the requirements of JEA Standards, state and local building codes. Construction is expected to take 60 days from start to finish. Construction must start by March 1, 2025 and must be 100% completed by June 2, 2025. All Questions must be submitted in writing to the JEA Buyer listed herein (Halley Stewart Reimhj@jea.com) at least five business days prior to the opening date. Questions received within five business days prior to the opening date may not be answered. For more information please contact the JEA Buyer at: Halley Stewart Reimhj@jea.com Bidder must show evidence of (2) similar contracts valuing $280,000.00 or more in the last three years ending November 30, 2024. The bid security shall either be issued by a surety company authorized to do business in the State of Florida, or Respondent shall furnish a certified check or cashier's check in the amount of five percent of the total amount shown on the Response Form. The JEA Bid Bond form can be found at jea.com. Failure to furnish the required bid security will disqualify the Response. If the Respondent is awarded the Work and fails to execute the Contract within ten (10) days of postmarked date on the Contract Documents, JEA shall retain the Bid Bond or check as liquidated damages. JEA reserves the right to cancel or change the date and time announced for opening of Responses at any time prior to the time announced for the opening of Responses. JEA may Award the Contract in whole or in part. JEA may award multiple or split Contracts if it is deemed to be in JEA's best interest.

Award

Water / Sewer

$346,613.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
54
Bidding Soon
1,054
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.