Published November 10, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in East Greenville, Pennsylvania. Completed plans call for site work for a road / highway; and road / highway.

CLARIFICATION DEADLINE 9/20/2023 5:00 PM. This project will consist of the excavation/demolition of the existing roadway to the subgrade, and placement of approximately 2,900 SY of 2A subbase stone, bituminous base and wearing course on Blaker Drive between State Street and Forge Road. Replacement of two (2) existing ADA ramps, removal, and relocation of two (2) existing ADA ramps, including curb and sidewalk approach, as well as providing pedestrian access routes throughout construction. Items for sweeping and preparation, and joint sealing around curbs, manholes, inlets, and valve boxes will be incidental to the project. A certified check or bank draft, payable to the order of the Borough of East Greenville, negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in the amount equal to ten percent (10%) of the total bid amount shall be submitted with each Bid. Award of Contract, if a Contract is awarded, will be to the lowest responsible bidder, but the Owner reserves the unqualified right to reject any or all bids and to waive any informalities. All current Pennsylvania Department of Transportation Standards and Specifications will prevail over all standards and specifications included in this contract. The successful Bidder will be required to furnish and pay for satisfactory Performance and Payment Bond and Labor and Materialmen's Bond, each in the amount of one hundred percent (100%) of the Contract Price with a corporate surety approved by the Owner. This Contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, which provides that training, employment, and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing. Attention is called to the fact that not less than the minimum salaries and wages are set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated because of their race, color, religion, sex or national origin. The Borough of East Greenville reserves the right to reject any or all Bids or to waive any informalities or irregularities in the bidding when, in the opinion of the Borough, such rejections or waivers shall be to its interest or advantage. Prior to awarding the contract, bids may be held by the Borough of East Greenville for a period not to exceed (60) days from the date of bid opening for the purpose of reviewing the Bids and investigating the qualifications of bidders.

Award

Roads / Highways

$252,970.00

Public - City

Paving, Site Work

5

18

6

4

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
373
Active Projects
207
Bidding Soon
3,100
All Active Projects
1,488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

October 16, 2023

img_map_placeholder

Multiple Locations, East Greenville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Blaker Drive Road Reconstruction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.