BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Bonner Springs, Kansas. Completed plans call for site work for a road / highway.

The Leavenworth County Department of Public Works is Requesting Bids for "Erosion Repairs and Permanent Seeding, 158th Street, K-32 Highway to Kansas Avenue." The work consists of performing erosion repair and finish grading of a portion of the right-of-way that failed to grow turf. The contractor shall repair areas, apply fertilizer, and place permanent seeding as identified on the following plan sheet. All seeding shall be completed with drill equipment and disturbance of existing vegetation and soils shall be maintained to a minimum to repair eroded areas, finish grade, and apply seed. No broadcast of seed shall be allowed on the project. Not all areas of the work that require reseeding will require erosion repair. The original project corridor included 7.4 acres of permanent seeding. Public Works staff estimates that approximately 15% of the area will require erosion repair and topsoil addition and 30% of the original project area will require fertilizer and permanent seed drilled. Please be advised that the work is "spot repair" in nature and does not allow for permanent seeding of the full project corridor. Bare areas that are over seeded shall be adequately mulched. All seeded areas shall receive fertilizer. Erosion repair areas shall be mulched. All work and materials specifications shall comply with the State of Kansas Standard Specifications for Road and Bridge Construction, latest edition. Questions regarding the RFB work and specifications should be addressed to Joe McAfee at 913-684-0471 between the hours of 8:00 a.m. to 5:00 p.m. The work consists of performing erosion repair and finish grading of a portion of the right-of-way that failed to grow turf. The contractor shall repair areas, apply fertilizer, and place permanent seeding as identified on the following plan sheet. All seeding shall be completed with drill equipment and disturbance of existing vegetation and soils shall be maintained to a minimum to repair eroded areas, finish grade, and apply seed. No broadcast of seed shall be allowed on the project. Not all areas of the work that require reseeding will require erosion repair. The original project corridor included 7.4 acres of permanent seeding. Public Works staff estimates that approximately 15% of the area will require erosion repair and topsoil addition and 30% of the original project area will require fertilizer and permanent seed drilled. The undersigned agrees, if this proposal is accepted, to fully complete the Work between September 6, and October 20, 2023

Bid Results

Roads / Highways

$97,400.00

Public - County

Site Work

3

3

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
79
Bidding Soon
1,376
All Active Projects
553
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 7, 2023

October 9, 2023

October 20, 2023

img_map_placeholder

158th St, Bonner Springs, KS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.