BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Horicon, Wisconsin. Design plans call for site work for a water / sewer project.

As of October 17, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in April 2025 and end in December 2026. *The closed solicitation has been included below for reference: PROJECT DESCRIPTION: The project will provide long term structural stability of the lock chamber walls and floor of the Montello Dam Lock Chamber and continued ability to manipulate water levels. In addition to a sagging stacked stone wall, small sinkholes have been identified in the earthen embankment behind both lock walls. Complete reconstruction of the lock channel may be needed if the structural issues are significant enough to merit it. The stacked stone wall is historically significant; the selected firm will assist the DNR in historical coordination as appropriate. Additionally, State Highway 22 crosses over the lock chamber; coordination with WISDOT, other utility companies, and adjacent landowners is anticipated. PROJECT SCHEDULE: A/E Selection September 2023 Design Report April 2024 SBC Approval June 2024 Bid Opening February 2025 Construction Start April 2025 Substantial Completion December 2025 Project Closeout December 2026

Design

Water / Sewer

$5,026,900.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
149
Bidding Soon
1,335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

To Be Determined, Horicon, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.