BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Horicon, Wisconsin. Design plans call for site work for a water / sewer project.

As of October 17, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in April 2025 and end in December 2026. *The closed solicitation has been included below for reference: PROJECT DESCRIPTION: The project will provide long term structural stability of the lock chamber walls and floor of the Montello Dam Lock Chamber and continued ability to manipulate water levels. In addition to a sagging stacked stone wall, small sinkholes have been identified in the earthen embankment behind both lock walls. Complete reconstruction of the lock channel may be needed if the structural issues are significant enough to merit it. The stacked stone wall is historically significant; the selected firm will assist the DNR in historical coordination as appropriate. Additionally, State Highway 22 crosses over the lock chamber; coordination with WISDOT, other utility companies, and adjacent landowners is anticipated. PROJECT SCHEDULE: A/E Selection September 2023 Design Report April 2024 SBC Approval June 2024 Bid Opening February 2025 Construction Start April 2025 Substantial Completion December 2025 Project Closeout December 2026

Design

Water / Sewer

$5,026,900.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
75
Bidding Soon
2,339
All Active Projects
727
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 1, 2025

December 1, 2026

img_map_placeholder

To Be Determined, Horicon, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.