Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2024 at 7:00 PM

Updated January 31, 2024

Site work and paving for a mixed-use development in Napa, California. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Milliken Raw Water Pipeline consists of approximately 6,500 LF of 16" welded steel pipe, most of which is above ground and supported by redwood saddles. The pipeline runs adjacent to Milliken Creek on an unpaved trail with steep grades on either side, roughly half its length accessible by foot or ATV sized vehicles only. It is used to convey raw, untreated water from a diversion dam to the Milliken Water Treatment Plant. The Atlas Fire in 2017 damaged the pipeline (since repaired) and damaged the trail, including a 263-ft wooden ATV access way. The goal of the Project is to repair the damages to the trail (primarily retaining walls) and replace the ATV access way with a 263-ft steel ATV access way, while also replacing the 348 feet of existing pipeline beside it. The project also includes installation of a 39-ft steel bridge and a 75-ft steel walkway. Portions of this project are FEMA-funded, as indicated on the Bid Schedule. The Project must be fully completed within 126 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about January 9, 2024, but the anticipated start date is provided solely for convenience and is neither certain nor binding.

Final Planning

Water / Sewer

$4,939,316.00

Public - City

Paving, Site Work

41

23

4

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
217
Bidding Soon
3,452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2024

March 19, 2024

Project location map

630 Chapparal Cir, Napa, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed