BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Horseshoe Bend, Idaho. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

This work shall consist of the Contractor furnishing, operating, and maintaining one or more Portable Traffic Signal system(s), depending on the Contractors method of operation. Each Portable Traffic Signal system shall consist of up to four (4) separate units consisting of one (1) master unit and up to three (3) slave units capable of being easily towed separately or coupled together for towing to the jobsite by a single tow vehicle. This work shall also consist of setup, maintenance, repair, operating, and tearing down in accordance with these and the manufacture specifications, the plans, or as directed. The system shall meet the physical display and operational requirements of conventional traffic signals as specified in Part IV of the Manual on Uniform Traffic Control Devices (MUTCD) as adopted by the State, Institute of Transportation Engineers, and National Electrical Manufacturers Association. Key No. 20384 Sh-55 Fleming Cr Br Est. Value Notes: $5,000,000 to $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. replacing the existing bridge on SH-55 over Fleming Creek with a new voided slab bridge. Minor alignment modifications, Mechanically Stabilized Earth retaining walls and guardrails Please Contact the Resident Engineer Dan Gorley P.e. At (208) 334-8938 or Dan.gorley@itd.idaho.gov for Any Design-related Questions. IDOT: SH-55 Fleming Creek Bridge

Bid Results

Bridges / Tunnels

$6,511,315.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

25

5

5

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
29
Bidding Soon
338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

September 4, 2024

Project location map

ID-55, Horseshoe Bend, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.