BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2024 at 8:00 PM

Updated September 20, 2024

Renovation of a mixed-use development in Cambridge, Kansas. Conceptual plans call for the renovation of a educational facility.

Update:https://www.cambridgema.gov/-/media/Files/budgetdepartment/FinancePDFs/fy25adoptedbudget/fy25adoptedbudgetbook.pdf The FY25 bond proceed allocation of $2,560,000 will address ongoing capital priorities in building repairs across Cambridge Public Schools (CPS). Capital project targets for FY25 include: Baldwin School Chiller Replacement; the Baldwin School Electrical Vault Beam Replacement; The Media Arts and RSTA auto shop waterproofing; Fletcher Maynard Academy (FMA) rear wall facade repairs; and the Cambridgeport & FMA Schools elevator controls upgrade. Project is included City of Cambridge Fiscal Year 2025-2029 Page no 474 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This ongoing capital appropriation will address priority building repairs across Cambridge Public Schools (CPS). Project targets for FY24 include replacing the roof and drain system at the Longfellow Building; elevator controls beginning with the Amigos and Cambridgeport Schools; replacing outdated natural gas heaters with electric heat pumps at the Kennedy-Longfellow Building; replacing rooftop units at the Solomon Media Arts Building; upgrading rooftop exhaust fans at the Peabody School; and updating the HVAC control system at the Cambridge Rindge and Latin School RSTA section. FY-2023-2024 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$9,760,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
56
Bidding Soon
741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

Multiple Locations, Cambridge, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.