BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Pell City, Alabama. Completed plans call for site work for a water / sewer project.

Construction of Installation of Approximately 2,700 Lf of 6 Pvc Water Line, 370 Lf 8 Hdpe Directional Bore, 70 Lf 10 Steel Casing (Open Cut), Master Meter Vault and Related Items. All Bidders must be properly licensed in accordance with the requirements of the State Licensing Board for General Contractors (Chapter 8, Title 34, Code of Alabama, 1975 or latest). Project Estimate: $250,000.00 - $300,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$235,450.00

Public - City

Site Work

13

11

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
3
Bidding Soon
633
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

November 3, 2023

Project location map

Center Star Cut Off Rd, Pell City, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.