BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in North Babylon, New York. Working plans call for site work for a water / sewer project.

Reference Number 0000329194 Rehibilitation Of Guggenheim Lake (Deer Lake) - Phase 2 SCOPE OF WORK The Project drawings and specifications developed by P.W. Grosser contained in this offering illustrate all work to be performed. The work includes but is not limited to: A. The Suffolk County Department of Public Works (SCDPW) will be installing a new well and pump in an existing recharge basin at the corner of Weeks Road and Bayshore Road. The well will discharge will be into Sampawams Creek and flow into Deer Lake. The work at this site will entail the furnishing and installing a new well, well pump, ductile iron piping and fittings, flow monitoring equipment, electric service, pump starter, and cellular control system. The work will require site work including trenching, soil stabilization, asphalt restoration, fence installation, concrete, etc. B. Deer Lake is separated by an earthen dam with a weir structure. This causes the southern lake elevation to be at a lower elevation than the northern lake elevation. A new lake level monitoring station will be installed on the southern end of the lake. The lake level monitoring station will be affixed to the recently constructed observation pier located on the southern end of Deer Lake on Kime Avenue. The lake level monitoring station will consist of a cellular control system, mast, solar panel and level transducer. C. The lake level monitoring station will transmit the lake level to an online portal. The online portal will be programmed to start and stop the pumps at defined lake elevations. The online portal will also monitor the flow rate of the pump and the total gallons pumped. D. The contractor is required to perform all works scopes of this project including the well drilling, electric, and site work. The contractor is also required to retain the services of a controls integrator to establish communications between the well pump and lake level monitoring station through the online portal *PROJECT CANCELLED*

Final Planning

Water / Sewer

$398,250.00

Public - County

Site Work

4

13

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
219
Bidding Soon
4,134
All Active Projects
1,846
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

November 14, 2024

img_map_placeholder

Multiple Locations, North Babylon, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.