Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Jasper, Tennessee. Completed plans call for site work for a water / sewer project.

The Project consists of the construction of 6,500 linear feet of 4-inch ductile iron pipe water main piping and all necessary appurtenances along Murphy Hollow Road and Egypt Hollow Road. The new 4-inch water main will connect to the existing Dade County Water and Sewer Authority water main along Murphy Hollow Road with a proposed meter. The Owner reserves the right to reject any or all Bids. All questions should be directed to Melanie Head, P.E., Croy Engineering at 470-648- 6033 or mhead@croyeng.com.

Post-Bid

Water / Sewer

$100,000.00

Public - County

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
72
Bidding Soon
1,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

October 23, 2023

Project location map

Multiple Locations, Jasper, TN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed