BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in West Des Moines, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruction of SE Adams Street from SE Orilla Road to the site of a new West Des Moines Water Works water tower. SE Adams will be reconstructed from an existing 2-lane rural gravel road to a 2-lane urban concrete roadway, including a cul-de-sac at the entrance to the water tower site. The remainder of existing SE Adams Street from the water tower site to Veterans Parkway will be removed. Actual construction will most likely be deferred until 2024 in order to not interfere with construction access to the new water tower site. This project is included in the city's fiscal year 2023-2024 Capital Improvement Program. As of September 12, 2023, the project is completed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Occupancy

Roads / Highways

$380,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
100
Bidding Soon
1,107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2023

Project location map

Adams St, West Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.