BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Susanville, California. Completed plans call for site work for a water / sewer project.

Deadline 09/15/2023 at 12:00 PM PT All questions should be emailed directly to the Contract Specialist, Contracts Specialist Name: Kelly Ollivant E-Mail Address: Kelly.Ollivant@usda.gov The United States Forest Service (USFS) is seeking quotations for the supply and installation of reinforced polypropylene lines to three (3) existing well ponds at three (3) separate locations within the Lassen National Forest, California, as per the specifications. The USFS intends to conduct this acquisition by use of simplified acquisition procedures in accordance with Federal Acquisition Regulation (FAR) Part 13. A single contract award will be made to the offeror that submits a quotation that has been determined to represent the best value to the Government based on as assessment of (1) Technical/Management Approach, (2) Past , and (3) Price. This allows the Government to accept other than the lowest priced quote. The Government may perform a comparative evaluation (comparing offers to each other) to select the contractor that provides the best value, considering the evaluation factors in this solicitation. Title: Lassen National Forest Well Pond Relining, California Description: The United States Forest Service (USFS) is seeking quotations for the supply and installation of reinforced polypropylene lines to three (3) existing well ponds at three (3) separate locations within the Lassen National Forest, California, as per the specifications. The USFS intends to conduct this acquisition by use of simplified acquisition procedures in accordance with Federal Acquisition Regulation (FAR) Part 13. Period of : 10/01/2023 to 12/31/2023 0001 White Horse Well Pond (T33N, R8E, Section 33) Furnish and install per manufacturers specifications a 45 mil reinforced polypropylene liner and a geotextile underlayer on an existing water storage pond. Size of liner and geotextile underlay will be 160 feet width by 160 feet length. The existing degraded PVC pond liner, liner will be removed and disposed of, and new geotextile underlay will be placed and new liner will be placed over the geotextile layer. There are three pipe penetrations that will need waterproof pipe boots constructed and installed to prevent leakage. Existing onsite materials will be used for anchoring liner edges. Remove and dispose of existing pond liner. Delivery Code: 91Y7 USDA FS LASSEN NATIONAL FOREST 2550 RIVERSIDE DRIVE SUSANVILEE CA 96130 US 0002 Bogard Well Pond (T32N, R8E, Section 33) Furnish and install per manufacturers specifications a 45 mil reinforced polypropylene liner and a geotextile underlayer on an existing water storage pond. Size of liner and geotextile underlay will be 160 feet width by 160 feet length. The existing degraded PVC pond liner liner will be removed and disposed of, and new geotextile underlay will be placed and new liner will be placed over the geotextile layer. There are three pipe penetrations that will need waterproof pipe boots constructed and installed to prevent leakage. Existing onsite materials will be used for anchoring liner edges. Remove and dispose of existing pond liner. Delivery Code: 91Y7 USDA FS LASSEN NATIONAL FOREST 2550 RIVERSIDE DRIVE SUSANVILEE CA 96130 US Halls Flat Well Pond (T33N, R6E, Section 13) Furnish and install per manufacturers specifications a 45 mil reinforced polypropylene liner and a geotextile underlayer on an existing water storage pond. Size of liner and geotextile underlay will be 160 feet width by 160 feet length. The existing pond does not have a liner, and will be drained. Subgrade of pond will need preperation before placing geotextile underlay, a geotextile underlay will be placed, and liner will be placed over the geotextile layer. There are two pipe penetrations that will need waterproof pipe boots constructed and installed to prevent leakage. Existing onsite materials will be used for anchoring liner edges. Delivery Code: 91Y7 USDA FS LASSEN NATIONAL FOREST HAT CREEK RANGER DISTRICT PO BOX 220 FALL RIVER MILLS CA 96028-0220 US Between $100,000 and $150,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$150,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
16
Bidding Soon
149
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2023

October 1, 2023

img_map_placeholder

Multiple Locations, Susanville, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.