BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Alexander, Manitoba. Completed plans call for site work for a bridge / tunnel.

Section I: PR 304 (Project ID No. C07289) Supply and install one (1) precast concrete culvert by jacking through Provincial Road 304, 0.86 km east of PTH 59, in the Rural Municipality of Alexander. Section II: PR 204 - Old River Road (Project ID No. C07308) Install two (2) corrugated steel pipe culverts by trenching (open cut) through Provincial Road 204, approximately 7.28 km north of PTH 101, in the Rural Municipality of East St. Paul. Section III: PR 204 - Misty Creek (Project ID No. C07309) Install one (1) corrugated steel pipe culvert by trenching (open cut) through Provincial Road 204, approximately 10.1 km north of PTH 101, in the Rural Municipality of St. Clements. Section IV: PR 216 (Project ID No. C07235) Supply and install two (2) corrugated steel pipe culverts by trenching (open cut) through Provincial Road 216, 5.4 km south of Provincial Truck Highway 52, in the Rural Municipality of Hanover. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Sub Completion and Completion Date. Completion Date and Liquidated Damages Sub Completion Shall Be Defined as All Work on Sections Ii, Iii, and Iv. The Sub Completion Work Must Be Completed No Later Than November 15, 2023. See Special Provision Construction Schedule for Section Iii. Daily Liquidated Damages After This Specified Sub Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Completion Date Shall Be Defined as All Remaining Work. The Work Must Be Completed by No Later Than March 15, 2024. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Daily Liquidated Damages That Shall Be Charged at Any Given Time is Five Hundred ($500.00) Dollars Per Calendar Day. Seasonal Shutdown Date The Seasonal Shutdown Date for This Project is: April 1st, 2024 - June 15th, 2024. Question Acceptance Deadline: 2023/09/22 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Bridges / Tunnels

$1,310,380.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
50
All Active Projects
10
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

October 2, 2023

img_map_placeholder

Multiple Locations, Alexander, MB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.