Site work for a water / sewer project in Placentia, California. Completed plans call for site work for a water / sewer project.

The scope of work includes the rehabilitation of approximately 6,479 linear feet of sanitary sewer main, the rehabilitation of approximately 95 linear feet of sanitary sewer manhole, and re-channeling of existing manhole base. Sewer main rehabilitation work includes but is not limited to: CCTV, cleaning and lining of sanitary sewer main mains with cured in place pipe (CIPP), disposal of existing liner, service reconnection, abandonment in place of existing sewer main, traffic control, and sewage bypass. Sewer manhole rehabilitation work includes but is not limited to: cleaning, grout injection, lining of sanitary sewer manhole, re-channeling of sewer manhole base, testing and replacement of manhole frames and covers. The Site of the Work is described as follows: Various locations throughout the Yorba Linda Water District service area. Each Bid shall be accompanied by a certified or cashier's check or bid bond in an amount not less than ten percent (10%) of the total bid price, payable to the Yorba Linda Water District, as a guarantee that the Bidder, if its Bid is accepted, shall promptly execute the Agreement, furnish a satisfactory Faithful Performance Bond in an amount not less than one hundred percent (100%) of the total bid price, furnish a Labor and Materials Bond in an amount not less than one hundred percent (100%) of the total bid price, and furnish certificates and any other documentation requested by the Owner evidencing that the required insurance is in effect in the amounts set forth in the Contract Documents. Question Deadline 10/05/2023 All questions relative to this Project prior to the opening of bids shall be directed to the Owner's Representative for the Project: Adrian Ayala, E.I.T. Yorba Linda Water District 1717 E. Miraloma Avenue Placentia, California 92870 aayala@ylwd.com All Work must be completed within One Hundred and Twenty (120) calendar days from the Notice to Proceed. It is agreed that damages for the failure of the Contractor to complete the total Work described herein within the time limits required are impossible to ascertain but that the sum of One Thousand Dollars ($1,000.00) per day is a reasonable estimate. Should the Work not be completed within the specified time for completion, the Contractor shall be liable for liquidated damages, payable to the Owner, as set forth in the General Provisions, in an amount One Thousand Dollars ($1,000.00) for each calendar day of delay in completion. The Work is to be done in accordance with the Plans, Specifications and Contract Documents on file in the Owner's office located at 1717 E. Miraloma Avenue, Placentia, California 92870, which plans and specifications are designated as above, and which documents are by this reference incorporated herein. The Work involves performing all work and furnishing all labor, materials and equipment, as provided by the Contract Documents, for a completed work of improvement as follows: FY23-24 Sewer CIPP Rehabilitation, Contract No. J-2023- 40S The scope of work includes the rehabilitation of approximately 6,479 linear feet of sanitary sewer main, the rehabilitation of approximately 95 linear feet of sanitary sewer manhole, and re-channeling of existing manhole base. Sewer main rehabilitation work includes but is not limited to: CCTV, cleaning and lining of sanitary sewer main mains with cured in place pipe (CIPP), disposal of existing liner, service reconnection, abandonment in place of existing sewer main, traffic control, and sewage bypass. Sewer manhole rehabilitation work includes but is not limited to: cleaning, grout injection, lining of sanitary sewer manhole, re-channeling of sewer manhole base, testing and replacement of manhole frames and covers.

Bid Results

Water / Sewer

$395,020.00

Public - City

Site Work

6

14

4

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
106
Bidding Soon
2,285
All Active Projects
1,022
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

November 18, 2023

img_map_placeholder

Multiple Locations, Placentia, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.