BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Auburn, California. Completed plans call for site work for a water / sewer project.

Project was awarded to Chris Galloway Construction in the amount of $640,069.37. Project Description: In accordance with plans and specifications prepared by Peterson Brustad, Inc. (PBI), the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of a new vertical well and the demolition of approximately 2,000 linear feet of 2-inch galvanized pipe, construction of a new well site, well drilling, well development, well testing, water quality analysis, installation of approximately 2,000 linear feet of 2-inch HDPE pipe, approximately 1,000 linear feet of conduit and signal wire, water storage tank floats, solar panels and foundations, electrical wiring, perimeter chainlink fence, and a precast concrete building. A project walk-through will follow onsite. A sign-in sheet will be available up until 8:15 a.m. only. Attendance at the entire pre-bid meeting and walk-through is mandatory for bidding. Bids received from Bidders who did not sign the sign-in sheet and attend the meeting and walk-through will be returned to the Bidder unopened. Attendance by subcontractors is not mandatory, but all interested prospective subcontractors are encouraged to attend. The Owner will transmit to all recipients complete sets of Contract Documents such Addenda as Owner considers necessary in response to questions raised at the meeting and walk-through. Oral statements not confirmed by Addenda may not be relied upon and are not binding or legally effective. Except for mandatory walk-through, no other access to the project site will be granted pre-bid without the Owner's approval. During all site visits the Bidder must be accompanied full time by an authorized representative of the Owner. No exceptions to this requirement. Written questions regarding the Contract Documents and/or the proposed Work should be directed to Jonathan Boland, GE, Associate Engineer by phone at (530) 367-6711, or e-mail at jboland@pcwa.net no later than October 2, 2023. Location of Work. The Work will be performed at the following location: Middle Meadows Campground, Eldorado National Forest, Placer County.

Award

Water / Sewer

$640,069.00

Public - County

Site Work

16

14

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
57
Bidding Soon
1,131
All Active Projects
459
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 5, 2024

img_map_placeholder

Multiple Locations, Auburn, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.