BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in San Jacinto, California. Contact the soliciting agency for additional information.

SCOPE OF WORK HVAC assessments to determine scope of work per the California Schools Healthy Air, Plumbing, and Efficiency (“CalSHAPE”) Ventilation Program guidelines enacted under Assembly Bill 841. The goals of the project are to improve HVAC system energy efficiency, safety, performance and complete all services mandated by the CalSHAPE Ventilation Program Guidelines for current and future approved funding applications. Upon award, the selected respondent will be required to perform all scope of work for the HVAC Assessment requirements included in the CA Energy Commission CalSHAPE Ventilation Program Guidelines (Attachment B). Scope of work applies to the attached list of school sites (Attachment C). The District has successfully submitted its CalSHAPE Application and has received approved funding for twelve (12) sites. Consultant shall refer to Sections B, C, D, E, F, and G for detailed scope of services in the CalSHAPE Guidelines, (Exhibit A) which includes an HVAC Assessment. Contractor to provide all data and coordinate with the Facilities and Operations Assistant Director in the reporting and completion of the HVAC Assessment Reports for each site.The scope of work is summarized herein and includes, but is not limited to, the following tasks (refer to guidelines) This Request for a SOQ does not commit the District to award a contract or pay any costs incurred in the preparation of a response to this request. The District reserves the right to accept all or part of any responses or to cancel in part or in its entirety this SOQ. The District further reserves the right to accept the response that it considers to be in the bestinterest of the District. The District reserves the right to accept all or part of any responses or to cancel in part or in its entirety this SOQ. The District further reserves the right to accept the response that it considers to be in the best interest of the District.

Post-Bid

Educational

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
80
Bidding Soon
1,580
All Active Projects
741
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

February 26, 2024

img_map_placeholder

Multiple Locations, San Jacinto, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.