Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Springdale, Arkansas. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; water / sewer project; and bridge / tunnel.
As of June 2024, this project is confirmed to be under construction. The Purpose of This Project is to Construct Approximately 6.919 of Two Lane Roadway With Bridge Structures on Highway 612 in Washington and Benton Counties. This Project Consists of Clearing and Grubbing, Removal and Disposal Items, Earthwork, Aggregate Base Course, Cement Stabilized Crushed Stone Base Course, Achm Base, Binder, and Surface Courses, Cold Milling Asphalt, Achm Patching of Existing Roadway, Portland Cement Concrete Pavement, Approach Slabs and Gutters, Maintenance of Traffic, Concrete Ditch Paving, Minor Drainage Structures, Guardrail, Erosion Control Items, Rumble Strips, Traffic Signal and Illumination Items, Construct Five Continuous Plate Girder Units (Total Lengths 1243.66'), Construct Two Continuous W-beam Units (Total Lengths 465.44) Construct Eight Prestressed Continuous Concrete Girder Units (Total Lengths 3348.04') Construct One Sextuple R. C. Box Culvert (Total Span 40.33') Pavement Marking, and Misc Items. Routes: 612 Sections: 1 & 2 County: Benton & Washington Length: 6.919 Miles in Length. Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financial assistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. This Proposal Contains the Special Provision establishing Contract Time - Working Day Contract in Which the Bidder Will Determine the Number of Working Days to Complete the Project. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - Hwy. 412 - Hwy. 112 (Springdale Bypass) (F)
Under Construction
Roads / Highways
$180,787,345.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2023
April 22, 2024
AR-612, Springdale, AR
Related To This Project
Springdale, AR
Bid Date: Oct 10 2023
Springdale, AR
Bid Date: Oct 17 2023
Springdale, AR
Bid Date: Oct 17 2023
Springdale, AR
Bid Date: Oct 23 2023
Springdale, AR
Bid Date: Nov 01 2023
Springdale, AR
Bid Date: Nov 06 2023
Springdale, AR
Bid Date: Apr 01 2021
Springdale, AR
Bid Date: Nov 28 2023
Springdale, AR
--
Springdale, AR
--
Springdale, AR
Bid Date: Jan 18 2022
Springdale, AR
Bid Date: May 25 2021
Springdale, AR
--
Springdale, AR
--
Springdale, AR
Bid Date: Aug 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.