BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a municipal facility in Seattle, Washington. Completed plans call for the remodel of a municipal facility; and for the renovation of a 81,238-square-foot municipal facility.

This Project is a Covered Project subject to the City of Seattle's Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city's construction projects. It gives contractors access to these skilled workers. The Project includes tenant improvements to the existing Seattle City Light offices on floors 30, 34, 35, and 36, in the Seattle Municipal Tower. The work includes approximately 81,238 SF of space and will be completed in two scheduled groupings of floors. The interior tenant improvement includes demolition of some existing partitions, doors, finishes, ceilings, mechanical, electrical, plumbing, fire suppression system elements, and includes new partitions, doors, hardware, glazing, flooring, casework, finishes, lighting controls, ceiling revisions and new portions of ceilings, fixtures, mechanical, electrical, plumbing, fire suppression, fire alarm work as well as coordination with owner vendor for security, data, and furniture systems. Work also includes relocation of some existing mechanical system elements. A portion of floor 35 will have existing heavy fire storage files that will remain and will be required to be protected and moved as required to complete work. a. Schedule 1 Group will consist of floors 35 and 36. The Work for Schedule 1 will begin on this schedule group at NTP. The Work for Schedule 1 must be completed within 150 calendar days of Notice to Proceed, no additional time will be approved during this stage. These schedule 1 floors completion times are critical due to termination of an off-site lease. The anticipated NTP date is November 13, 2023. b. Schedule 2 Group will consist of floors 30 and 34 and can begin when Substantial Completion of Schedule 1 has been achieved, but no earlier than March 15, 2024, or at a date approved by the Owner and will be substantially completed within 130 workdays of that date schedule 2 start date. c. If Schedule 1 work is completed early, the remaining calendar days may carry forward to Schedule 2 but shall not exceed the total 280 calendar day allowance. Additive Alternate #1: Sound Masking System 1) Provide sound masking for open office areas on all floors with conventional celling plenum-mounted masking speakers an equipment rack to house amplifiers, digital signal processor, controls, and other components. 2) See specification Section 27 41 00 and Section 27 41 17 for additional information. Substitutive Alternate #2: Toilet Compartment Replacement Base Bid includes: 1) Paint existing metal toilet compartment metal panel. See 10 21 13 for factory painted metal toilet compartments at locations with new toilet compartments. Substitutive Alternate Bid No. 2 includes: 1) Replace existing toilet compartments with new stainless steel toilet compartments. See Section 10 21 13 for stainless steel toilet compartments. See 05 50 00 for supports of ceiling hung toilet compartments. 2) Field verify existing structure support or provide field engineered support as required to attach to existing structure. A/E ESTIMATE: Base Bid: $8,213,561; Additive Alternate #1: $560,183; Substitutive Alternate #2: $39,607 The Project includes tenant improvements to the existing Seattle City Light offices on floors 30, 34, 35, and 36, in the Seattle Municipal Tower. The work includes approximately 81,238 SF of space and will be completed in two scheduled groupings of floors. a. Schedule 1 Group will consist of floors 35 and 36. The Work for Schedule 1 will begin on this schedule group at NTP. The Work for Schedule 1 must be completed within 150 calendar days of Notice to Proceed, no additional time will be approved during this stage. These schedule 1 floors completion times are critical due to termination of an off-site lease.

Award

Municipal

$7,637,032.00

Public - City

Remodeling, Renovation

96

23

61

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
31
Bidding Soon
877
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

November 13, 2023

img_map_placeholder

700 5th Ave, Seattle, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.