Site work and paving for a civil project in Earlington, Kentucky. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Preston Bunch Lane Subsidence The proposed Preston Bunch Lane Subsidence AML Reclamation Project will repair a portion of a public roadway approximately 1700 feet long that has been damaged by mining subsidence and/or mining influenced slope instability. The work will consist of excavating the subgrade to specified depths then backfilling and compacting with soil and with roadway stone to stabilize the roadbed. The driving surface will be reestablished with Bituminous Pavement. Drainage culverts will be replaced with 24-inch diameter HDPE culverts. The site is located in the Madisonville West Quadrangle at N 37 16' 34", W 87 30' 22". The problem areas are approximately 550' to 2,250' from the intersection of US 41 and Preston Bunch Lane on the north side of Earlington, KY. A subsidence area or mining influenced slope instability has developed underneath Preston Bunch Lane. This has caused the driving surface to upheave and a break has formed along the road. Reclamation efforts include excavating 8 feet depth of the roadway subgrade and/or until competent rock is revealed from the subsidence/slide area. 700 feet of roadway will be excavated to the 8 foot depth. Other areas will be excavated to 3.5 feet depth. The roadway subgrade will be re-established by placing competent soil material in 12 inch lifts and backfilling the roadbed using filter Fabric, geo-grid and roadway stone. The excavated material will be reused to rebuild the subgrade and compacted to at least 95% of maximum density. A layer of filter fabric will then be placed on the compacted soil and six inches of size #2 Coarse aggregate will be placed on that layer of filter fabric. A layer of geo-grid will be placed on the #2's then 8 inches of Crushed Stone Base will be placed and compacted in two lifts. 4 inches asphalt layer will be applied by using standard AML construction techniques for Bituminous Pavement. Excavated pavement, waste material and incompetent soil generated from project construction will be placed at the waste area site as shown on plans.

Bid Results

Water / Sewer

$520,462.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
19
Bidding Soon
484
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

November 17, 2023

img_map_placeholder

US Hwy 41 & Preston Bunch Ln, Earlington, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.