BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Tybee Island, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of January 16, 2024 the contract was awarded to Phillips Paving. The amount of the contract was $462,962.50. The start and completion date has not yet been determined. Site work and paving for a road / highway in Tybee Island, Georgia. Working plans call for site work for a road / highway; and for paving for a road / highway. The City of Tybee Island seeks qualified bidders for the installation of various sized storm sewer and inlets, and the paving of various streets on the island. The areas planned for milling and resurfacing listed under Work Unit "A" are as follows: - 6 th Avenue from 12th Street to 13th Street (Mill existing asphaltic surface and resurface with 3" asphaltic pavement). - 7 th Avenue from 6th Avenue to Chatham Avenue (Mill existing asphaltic surface and resurface with 3" asphaltic pavement). - Lovell Avenue from Tybrisa Street to 14th Street (Mill existing asphaltic pavement and resurface with 3" asphaltic pavement; associated storm sewer work on the segment). - 14th Street from Butler Avenue (USH 80) to Jones Avenue (Mill existing asphaltic surface and resurface with 3" of asphaltic pavement). - Polk Street from Bay Street to Ship Watch Lane (Mill existing asphaltic surface and resurface with 3" asphaltic pavement). ASPHALTIC PAVEMENTS - All asphaltic materials shall conform to the requirements and specifications of the Georgia Department of Transportation (GDOT). - Furnish and install GDOT 9.5 mm TPI mix for both the binder and surface course unless otherwise specified. - Contractor shall be responsible for trucking off of all spoils created by storm sewer work and milling operations. - Contractor must apply bituminous tack to existing surface prior to repaving, at a rate of 0.070 gallons per square yard. - Hot mix asphalt pavement and mixtures shall conform to the type, thickness, and gradation shown in the contract documents, unless otherwise specified. -Contractor must sweep all road edges prior to paving. - Contractor is responsible for all traffic control. - Contractor shall allow local traffic on roadway segments at all times. ASPHALTIC MILLING - Work covered under this section shall consist of furnishing all labor and equipment to remove the asphaltic pavement by milling to the thickness as shown in the contract documents. - Surplus material will become property of the CONTRACTOR and shall be picked up and disposed of by the CONTRACTOR. - Upon completion of the milling operations, the CONTRACTOR shall ramp all driveway entrances, and butt joints along the project route. The ramps shall provide a reasonably smooth transition from the existing pavement to the milled surface. The CONTRACTOR shall be required to maintain these ramps until the asphalt is placed, - If proper signage is utilized, i.e. rough road or uneven surfaces, the CITY will allow up to three (3) days after milling operations to place the new asphalt surface. The CONTRACTOR will be allowed to place the binder surface and let the public ride on that surface for up to seven (7) days. This will allow the CONTRACTOR to schedule multiple streets for paving with a surface coat. Work Unit "B" shall include the installation of 12-inch to 18-inch storm sewer pipe on 14 th Street between Lovell Avenue and 2 nd Avenue. The installation of storm sewer inlets and manholes is also included in this work unit. POINT OF CONTACT: Peter Gulbronson peter.gulbronson@cityoftybee.org Questions must be submitted at least seven days before the bid due date

Award

Roads / Highways

$462,963.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
58
Bidding Soon
772
All Active Projects
365
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 4, 2024

February 5, 2024

February 29, 2024

img_map_placeholder

Multiple Locations, Tybee Island, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.