BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a municipal facility in Tybee Island, Georgia. Completed plans call for the construction of a 3,045-square-foot municipal facility; and for site work for a municipal facility.

23105 Question Deadline 05/12/2026 Questions must be submitted at least seven days before the bid due date. Mark subject line on e-mail "Questions on ITB 2026-108: City of Tybee Island Marine Science Center - Restrooms POINT OF CONTACT: Peter Gulbronson peter.gulbronson@cityoftybee.gov The City of Tybee Island, GA may (i) reject any, any part of, or all bids and proposals with any party submitting a bid or proposal, or (ii) waive informalities and technicalities, (iii) negotiate directly with any party submitting a bid or proposal, or (iv) accept that proposal which the City of Tybee Island, GA deems to be in its best interest, whether or not it is the lowest dollar proposal. The City of Tybee Island seeks qualified bidders for the construction of a 275 square foot masonry block building to be used as a restroom, located at 37 Meddin Drive, Tybee Island, GA, 31328, which is owned by the City of Tybee Island. Contract documents and technical specifications are in a separate attachment to the ITB. If a conflict exists, the hierarchy shall be the City of Tybee ITB, then the Greenline Architecture contract documents, specifications, and plans (collectively). The project generally includes the following: Furnish all labor, materials, and equipment for the construction of a 11'-0" by 24'-0" CMU wall building with exterior rated wood horizontal boards over black waterproofing. The roof shall be a standing seam roof, mechanical and plumbing features, flood venting, brick pavers in a herringbone pattern, concrete curbing, bollards, fence relocation, and other features conforming to the plans and specifications prepared by Greenline Architecture and attached to this ITB. Schedule and Special Considerations: Work must be substantially completed within 150 days after the notice to proceed. Work must be completed and ready for final payment within 180 days after the notice to proceed. The commencement date will be established in the contract and is expected to be within 30 days of the award. The contractor is responsible for furnishing all materials, labor, tools, equipment, and related services to complete the project.

Post-Bid

Municipal

$300,000.00

Public - City

New Construction, Site Work

17

14

2

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
77
Bidding Soon
882
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

June 18, 2026

Project location map

37 Meddin Dr, Tybee Island, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.