BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2024 at 8:00 PM

Updated April 1, 2024

Site work and paving for a road / highway in La Plata, Maryland. Completed plans call for site work for a road / highway; and for paving for a road / highway.

MBE Participation (%) 0.25 The County Commissioners reserve the right to reject any or all bids and to waive any informality in the bids received when such waiver is in the best interest of Charles County. Charles County Government is an Equal Opportunity Employer. The County Commissioners of Charles County are hereby requesting sealed bids from qualified contractors to perform construction services on the Mill Hill Road Sidewalk project located along Mill Hill Road between Homecoming Lane and Davis Road. Small, Local, and Minority Business Enterprises are encouraged to respond to this solicitation. A five percent (5%) Bid Bond from a surety licensed to do business in the State of Maryland and satisfactory to the County, certified check, or bank Cashier's/Treasurer's Check shall accompany the bid or the bid will not be considered. Bid Bonds shall have the accompanying Power of Attorney. Bid securities shall be returned promptly after the County and the selected Bidder have executed the contract, or, if no Bidder's bid has been selected within one-hundred-twenty (120) consecutive calendar days after the date of the opening of bids, upon the demand of the Bidder at any time thereafter, as long as the Bidder has not been notified of acceptance of his bid. The Bidder, to whom the contract shall have been awarded, shall be required to execute the contract in accordance with the terms and conditions herein. If the Bidder selected for award fails or refuses to execute the contract and/or fully comply with requirements of this solicitation their bid security shall be forfeit to the County as liquidated damages in accordance with the terms and conditions contained herein. A Performance Bond and Labor & Material Payment Bond in the amount of one-hundred percent (100%) of the contract price will be required from sureties licensed to do business in the State of Maryland and satisfactory to the County and shall be submitted to the County at the time of contract execution by the Bidder within the timeframes required herein. Premiums for the bonds described above shall be paid by the Contractor. Bonds shall contain a provision that it shall not be cancelled, non-renewed or materially altered without at least ninety (90) days written prior notice to the County. The Contractor selected shall complete the scope of work and all requirements contained herein within two hundred seventy (270) consecutive calendar days after start date to be specified in a written Notice to Proceed issued by Charles County Government, as established by the County and the Contractor, plus any contract time extensions approved by the County to complete all work to a point of substantial completion as deemed by the County. FAP NO. SRTS-3(338)E

Bid Results

Roads / Highways

$1,114,836.00

Public - County

Paving, Site Work

77

16

4

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
3
Bidding Soon
1,828
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

February 26, 2024

Project location map

Multiple Locations, La Plata, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.