BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Breckenridge, Colorado. Contact the soliciting agency for additional information.

The Town of Breckenridge is seeking bids for the 2023-2024 winter season for snow maintenance operations at the described below Town bus shelters, bus stops/bus pull outs and sidewalks. Snow plowing will be required when daily snow amounts equal or exceed 2". Plowing must be align with the below priority scheduling. This contract may run from November 1st, 2023 through April 30th, 2024. Questions can be directed to Kyle Gilmore Questions can be directed to Kyle Gilmore, Public Works Parks Assistant Manager via email kyleg@townofbreckenridge.com Top Priority: Flora Dora shelter (southbound), Flora Dora bus stop (north bound), Sky Park shelter, Free skier lot bus stop, Fraction Rd. shelter, Breckenridge Terrace #1 shelter, Breckenridge Terrace #2 shelter, Public Works shelter, Rec Center (west side of Airport Rd.) shelter, Rec Center (east side of Airport Rd.) bus stop, Pinewood #1 shelter, Pinewood #2 shelter, Justice Center bus stop, Olivia Lane shelter, and Union Mill shelter, Little Red school house bus stop, Lincoln Park bus stop, Uphill bus pull out at Campion Rd., Uphill bus pull out at Royal Tiger Rd., Downhill bus stop at Royal Tiger, Uphill bus pull out at Gold Flake Terrace, Downhill stop at Gold Flake Terrace, Vista Point stop, Corkcscrew Drive stop, F-Lot bus station/stops and center island. Second Priority: City Market shelter, Mountain Thunder bus stop, 4 O'clock run shelter, River Mountain Lodge bus stop, Pineridge bus stop, Sundowner #2 bus shelter, Snowflake lift bus stops, Grand Timber Lodge shelter, The Village bus stop, Park Ave Lofts bus stop, Main St. Station bus pull out/stop. Third Priority: Ski Hill Road (6 total stops - Ski Hill Condos, Ski Hill Nordic Center, Gold Camp uphill and downhill, Peak 8 bus pull out/stop, Sawmill Road), Ski and Racquet bus shelter, Base 9 shelter, Mill Run shelter, Now Colorado shelter, Flintstone shelter, Ice Rink shelter, French Creek shelter, Huron Landing shelter, Kennington Place pullout/lane, Timberline stop, Stan Miller Drive (sidewalks and 2 bus stops), Monitor Drive sidewalks.

Post-Bid

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
46
Bidding Soon
960
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

November 1, 2023

img_map_placeholder

Multiple Locations, Breckenridge, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.