BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2024 at 8:00 PM

Updated June 29, 2024

Site work and paving for a mixed-use development in Columbus, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project involves improvements to existing sidewalk and curb along 17th Avenue from the I-71 southbound ramps to just west of Billiter Boulevard. Improvements include replacing the existing sidewalk, curb, driveways, ADA curb ramps, and resurfacing of 17th Avenue. Traffic signals at the I-71 NB ramps, Hamilton Avenue, and Cleveland Avenue will be replaced. Curb extensions will be constructed to protect parking. Surface drainage will be improved with modifications to the storm sewer. Existing water service lines containing lead or galvanized materials shall be replaced. Preliminary engineering will determine the sidewalk width, final locations and surface materials for the curb extensions, and where marked crosswalks are needed (if any). Deadline to submit Questions May 24th 2024, 5:00 PM EDT

Award

Sidewalks / Parking Lot

$340,000.00

Public - City

Paving, Site Work

3

3

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
131
Bidding Soon
1,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.