BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a swimming pool in Bartlett, Illinois. Completed plans call for the renovation of a swimming pool.

Bartlett Aquatic Center Outdoor Pool Filter Renovation. Questions may be directed via e-mail to Kelly O'Brien, Superintendent of Parks and Planning at kobrien@bartlettparks.org. Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and Material Payment Bond, and required proof of insurance following the award of a contract. All bids will remain firm for 60 days after the bid opening. The Bartlett Park District reserves the right to reject any or all bids, to waive informalities on a bid, and to accept the lowest responsible bid that serves the best interests of the Park District. PROTECTION OF PROPERTY: The Contractor shall protect all existing public properties so no damage may be caused by work or operations for this project. Contractor shall provide all Park District approved safety signage and barricades as necessary and maintain all of these until directed to remove them. The cost of this shall be considered included in the bid. The Contractor shall be responsible for having all utilities located prior to construction beginning and maintaining and preserving all locating. If any utilities are encountered which conflict with previous locating the Contractor shall notify the Park District so the conflict may be resolved. Damage including but not limited to utilities, adjacent building envelope, building interior, and landscaping including turf and trees shall be repaired to original condition by the Contractor at no additional costs to the Park District. Damages by others (vandalism) will be corrected or replaced by the Contractor at no additional cost to the Park District. The Park District shall cooperate with the Contractor to minimize vandalism, but the contractor shall be ultimately responsible to correct any damage. SCOPE OF WORK: The Contractor shall follow and utilize all standard construction practices for the replacement of the existing pool filtration system with a new Regenerative filtration system. This includes the replacement of the existing vertical turbine circulation pumps, new variable frequency drives, new HALO system controller, new flowmeter to be interlocked with system controller and new air compressor & air dryer. GENERAL SPECIFICATIONS FILTER RENOVATION Bidders shall quote materials and installation per the following, any additions, deletions, or variations must be approved. All construction shall conform to: o Construction Documents provided by WT Group o Village of Bartlett Codes as applicable. o Illinois Department of Health Codes as applicable. o Contractor must remove and properly dispose of materials per specifications o Storage of materials and / or equipment shall be arranged by the Contractor and the Park District. o Before acceptance by the owner and final payment, all work shall be inspected by the Park District, Park District's representative, and the Village of Bartlett.

Post-Bid

Swimming Pools

$210,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
198
Bidding Soon
3,686
All Active Projects
1,545
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 16, 2023

November 6, 2023

April 30, 2024

img_map_placeholder

620 W Stearns Rd, Bartlett, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.