BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Gleason, Tennessee. Completed plans call for the renovation of a educational facility.

Any questions concerning the bid should be directed to John Liggett, Director of Finance (731-364-5429), or Wayne Reynolds, Supervisor of Maintenance (731-364-2578). Bids must be sealed and marked on the outside of the envelope: "SEALED BID#2024-09, PARTIAL ROOF REPLACEMENTS - GLEASON SCHOOL" Nothing herein is intended to exclude any responsible vendor, his or her product or service, or in any way restrain or Any questions concerning the bid should be directed to John Liggett, Director of Finance (731-364-5429), or Wayne Reynolds, Supervisor of Maintenance (731-364-2578). restrict competition. On the contrary, all responsible vendors are encouraged to offer a proposal. Weakley County is compliant with Title VI of the 1964 Civil Rights Act and as a result, does not discriminate on the grounds of race, creed, Total Square Footage: 4,365 - BASF Preferred - Remove all surface contaminants or other substances that may interfere with proper adhesion of new materials utilizing high-pressure water with a minimum pressure rating of 2,500 PSI around the perimeter edges only. - The existing roof will be scarified to remove 3/4 to 1" of the existing polyurethane foam roof. - The existing roof should be inspected; if areas are found to have bad decking, they should be removed and replaced. - The roof should be primed prior to installing the new polyurethane foam. - All roof top mechanical equipment, piping, vents, etc. should be masked prior to foaming. - Apply closed cell spray polyurethane foam. The average thickness of the foam should be 1.5 inches. It should be applied uniformly over the specified roof surfaces with a tolerance of plus or minus 1/4 " per inch of thickness, except where variations are required to ensure proper drainage or to complete a feathered edge. - Apply High Solids silicone base coat over the polyurethane foam. The silicone coating should be applied according to manufacturer specifications to achieve a minimum dry film thickness at approximately 10 mils. Allow the coating to cure. Inspect for thinly coated areas, uncured areas, or other defects. Any defects should be repaired prior to subsequent application of coating. The base coat should be clean, dry, sound, and free of dust, dirt, and other contaminants before application of the topcoat. - Apply High Solids silicone topcoat in a timely manner upon completion of base coat to insure proper adhesion between coats. The topcoat should be applied per manufacturer specifications to achieve a minimum dry film thickness at approximately 10 mils. - Apply ceramic granules @ 30 lbs. per square broadcast into the wet topcoat for proper granule adhesion. - After all the work is complete, remove all job-related debris and surplus materials and leave the premises in a neat and orderly condition. - The new roof system should be fire rated class "A" per UL 790. The Roofing System shall be BASF Preferred and qualify for the manufacturer's ten-year (10) guarantee. The roofing guarantee shall include labor and materials. Payment will be held or a 5% retainage until the guarantee has been presented to the Director of Finance. national origin or gender. Bids may be hand delivered or mailed to: John H. Liggett Director of Finance Weakley County, Tennessee 8319 Highway 22, Suite B Dresden, TN 38225

Award

Educational

$34,700.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
22
Bidding Soon
365
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

November 1, 2023

img_map_placeholder

3 State Championship Rd, Gleason, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.