BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and renovation of an educational facility in Fallbrook, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for paving for a educational facility.

This RFP is to provide IOR services required for the Agriculture Department Upgrades Project and HVAC Improvements Project at the Fallbrook High School campus beginning November 1, 2023. The District anticipates that one (1) DSA Class 1 IOR will be added to our team as the result of this procurement. This is a quick turnaround procurement, therefore no time alloted for clarification questions. This scope of work includes the removal of three existing relocatable classroom buildings, demolition of associated site areas designated for new improvements, new construction of a single-story 30' x 40' classroom building, a new greenhouse, a new accessible 12' x 40' relocatable restroom building, and site improvements to include grading, new underground utilities, and new concrete flatwork / walkways, and other associated improvements per bidding documents. Construction of the Agriculture Department Upgrades Project is scheduled to begin November 14, 2023, with final closeout by August 31, 2024. The working hours would be from 7am-4pm. ESTIMATED CONSTRUCTION COST The anticipated construction cost for both projects is: $4.3 million to $5 million. Provide a highly qualified Class 1 IOR to provide all inspection services as outlined in the attached contract agreement (Appendix A) for the complete construction and fit-out of the Projects. This scope of work primarily includes but is not limited to but is not limited to selective asbestos abatement, demolition, and re-construction necessary for the Modernization of the HVAC Systems, roofing systems, and interior upgrades at the Cafeteria Building, Performing Arts Building, and Media Center Building as required per bidding documents. Construction of the HVAC Improvements Project is scheduled to begin June 1, 2024, with final closeout by December 31, 2024. The working hours would be from 7am-4pm. It is the intent of the District to hire a total of one (1) Class 1 IOR. The full time (8hrs a day) IOR will cover the work at Fallbrook High School and report daily to the District Program Manager and Construction Manager. Planned Board Award: October 11, 2023 Commencement of Services: November 1, 2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$5,000,000.00

Public - County

Demolition, New Construction, Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
109
Bidding Soon
2,310
All Active Projects
1,023
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2023

November 14, 2023

img_map_placeholder

2400 S Stage Coach Ln, Fallbrook, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.