Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving, new construction and renovation of an educational facility in Fallbrook, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for paving for a educational facility.
This RFP is to provide IOR services required for the Agriculture Department Upgrades Project and HVAC Improvements Project at the Fallbrook High School campus beginning November 1, 2023. The District anticipates that one (1) DSA Class 1 IOR will be added to our team as the result of this procurement. This is a quick turnaround procurement, therefore no time alloted for clarification questions. This scope of work includes the removal of three existing relocatable classroom buildings, demolition of associated site areas designated for new improvements, new construction of a single-story 30' x 40' classroom building, a new greenhouse, a new accessible 12' x 40' relocatable restroom building, and site improvements to include grading, new underground utilities, and new concrete flatwork / walkways, and other associated improvements per bidding documents. Construction of the Agriculture Department Upgrades Project is scheduled to begin November 14, 2023, with final closeout by August 31, 2024. The working hours would be from 7am-4pm. ESTIMATED CONSTRUCTION COST The anticipated construction cost for both projects is: $4.3 million to $5 million. Provide a highly qualified Class 1 IOR to provide all inspection services as outlined in the attached contract agreement (Appendix A) for the complete construction and fit-out of the Projects. This scope of work primarily includes but is not limited to but is not limited to selective asbestos abatement, demolition, and re-construction necessary for the Modernization of the HVAC Systems, roofing systems, and interior upgrades at the Cafeteria Building, Performing Arts Building, and Media Center Building as required per bidding documents. Construction of the HVAC Improvements Project is scheduled to begin June 1, 2024, with final closeout by December 31, 2024. The working hours would be from 7am-4pm. It is the intent of the District to hire a total of one (1) Class 1 IOR. The full time (8hrs a day) IOR will cover the work at Fallbrook High School and report daily to the District Program Manager and Construction Manager. Planned Board Award: October 11, 2023 Commencement of Services: November 1, 2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$5,000,000.00
Public - County
Demolition, New Construction, Paving, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2023
November 14, 2023
2400 S Stage Coach Ln, Fallbrook, CA
Related To This Project
Fallbrook, CA
Bid Date: Nov 01 2023
Fallbrook, CA
Bid Date: Nov 16 2023
Fallbrook, CA
Bid Date: Dec 21 2023
Fallbrook, CA
Bid Date: Jan 31 2024
Fallbrook, CA
Bid Date: Feb 15 2024
Fallbrook, CA
Bid Date: Feb 08 2024
Fallbrook, CA
Bid Date: Mar 12 2024
Fallbrook, CA
Bid Date: Mar 13 2024
Fallbrook, CA
--
Fallbrook, CA
Bid Date: Apr 20 2022
Fallbrook, CA
--
Fallbrook, CA
Bid Date: Nov 04 2021
Fallbrook, CA
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.