BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Grayson, Kentucky. Completed plans call for the renovation of a municipal facility.

The Tourism Commission of Grayson KY invites proposals from General Contractors to provide all Work, including labor, material, equipment, supplies and transportation for: Renovation of an Existing Building 166 East Main Street Grayson, Kentucky 41143 The Work includes but is not limited to selective demolition, concrete work, wood stud construction, wood roof trusses, insulation, wood & hollow metal doors & frames, drywall, painting, wood trim, resilient flooring & base, acoustical ceilings, exterior insulation & finish system, roofing, ductwork, HVAC equipment, plumbing, electrical, lighting, sprinkler and alarm systems. All Bids must be submitted in accordance with the Bidding Documents issued by the Architect and this Invitation for Bids. The contract documents as Bidding Documents may be examined at: o Offices of the Owner- By appointment only at the Tourism Cabin, Grayson City Park, Carol Malone Blvd, Grayson, KY o By appointment with the architect, Robert J. Summerfeldt, (540)915-8333 o C&B Blueprint Co. 824 Sixth Street, Huntington, WV 25701, (305)525- 2175 Questions raised at that meeting and others received in writing and/or by email will be answered by Addenda issued not less than 3 days prior to the Bid Opening. No bids will be received by FAX or email. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding process. After the scheduled closing time for receipt of bids, no bid may be withdrawn for a period of thirty (30) days. All Bidders are required to furnish satisfactory Bid Security in the amount of 5% of the Bid. Bidders are required to comply with all requirements indicated in the bidding documents. The project is funded by local funds and a grant from USDA Rural Development and Davis-Bacon wage rates are NOT required. The successful Bidder will be required to furnish satisfactory Performance and Labor and Material Payment Bonds in the amount of the Contract price. The project requires that the work be substantially completed not later than one-hundred eighty (180) calendar days after receipt of a Notice to Proceed. The Owner will pay the Contractor a bonus of $100.00 per calendar day for earlier completion. If completion is delayed beyond 180 calendar days, the Contractor shall pay the Owner Liquidated Damages of $500.00 per calendar day. Legitimate changes to the project time may be made by Change Order that are requested in a timely manner and agreed to by the Owner. Standard A.I.A. Requests for Payment shall be submitted monthly to the Architect, forwarded within ten calendar days to the Owner and paid approximately thirty days thereafter. Ten percent (10%) retainage shall apply to the entire project and for 61 calendar days after Substantial Completion.

Bid Results

Municipal

$1,004,280.00

Public - City

Renovation

23

22

13

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
31
Bidding Soon
360
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

November 16, 2023

img_map_placeholder

166 E Main St, Grayson, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.