BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Tennessee Colony, Texas. Completed plans call for the renovation of a water / sewer project.

September 13, 2023 3:00 p.m Last Day to Submit Written Questions for Clarification to the Department This project is to replace the mechanical parts of the clarifier at the wastewater treatment plant - WWTP - Michael Unit packing plant located in Tenessee Colony Replace clarifiers mechanical parts. The clarifiers concrete containment is in reasonable condition; however, the metal components are non-compliant. The old metal components shall be removed and disposed of. The interior concrete clarifier shall be repaired and coated with a protective liner. New components to be installed shall include a new drive assembly, scraper mechanism, skirt, effluent weir, effluent pipe, inlet through, race skimmer, bridge assembly with handrail, scum pipe with lever arm and electrical services. - WWTP - Michael Unit Packing Plant, Tennessee Colony, Texas as shown by the construction plans as prepared by Engineering Company / TDCJ. Contractors are required to submit a HUB Subcontracting Plan as detailed in Exhibit 1. Failure to submit a completed HUB Subcontracting Plan will result in the bid being rejected from further consideration Contractor must provide evidence that demonstrates the contractor is qualified to satisfactorily perform the specified work and, the contractor shall submit written evidence to include a minimum of three (3) projects completed within the last ten (10) years of similar work, size, and complexity to include the owner's name, telephone number, location, type of facility, construction cost and the date of completion with all bid proposals. Contractor must be bondable and insurable at the levels required. All bid proposals must be accompanied by a Bid Deposit in the amount of 5% of greatest amount bid. Performance and Payment Bonds in the amount of 100% of the contract amount will be required upon award of a contract. The TDCJ reserves the right to reject any or all bids, and to waive any informality or irregularity. It is the TDCJs intent to issue the Notice to Proceed at the Pre-Construction Meeting with the performance period to begin upon issuance.

Post-Bid

Water / Sewer

$1,715,200.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
48
Bidding Soon
1,953
All Active Projects
753
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2023

December 8, 2023

img_map_placeholder

To Be Determined, Tennessee Colony, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.