Site work for a water / sewer project in Miller, South Dakota. Completed plans call for site work for a water / sewer project.
Mid-Dakota Rural Water System, Inc. | Contract 4-7 Schedule 1 System Improvements The Project consists of constructing approximately 139,150 feet of 3-inch, 6-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings and all appurtenances required by the Project Drawings, Specifications, and Contract Documents. The project is located in Hughes, Potter and Sully Counties in South Dakota. A Bid must be accompanied by Bid security made payable to Owner in the amount of ten (10) percent of Bidder's maximum Bid Price (determined by adding the base bid and all alternates) in the form of a Bid (on the form included in the Bidding Documents) issued by a surety the requirements of Paragraphs 6.01 and 6.02 of the General Condition or by a certified check or bank money order payable to the Owner in the amount of five (5) percent of the Bidders maximum bid price. Bidders on this work will be required to comply with the Presidents Executive Order Nos. 11246 as amended, 11458, 11518, and 11625 as amended. The requirements for bidders and contractors under these orders are explained in the specifications. This project may be partially funded using American Rescue Plan Act (ARPA) funds. As a condition of the ARPA funding guidelines, the Contractor shall meet the following requirements: 1. Contractors are required to employ a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products.) The Contractor shall provide documentation of such efforts to purchase goods, products, or materials produced in the United States upon request. 2. The Contractor shall make a good faith effort to utilize Disadvantaged Business Enterprises (DBE) and/or Minority Business Enterprises (MBE) and shall provide documentation of the effort to solicit bids from qualified entities upon request. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order No. 12138. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women's Business Enterprises (WBE) are explained in the contract documents. The goal for MBE is 1% of the total dollar value of the project. The goal for WBE is 4% of the total dollar value of the project. Owner reserves the right to reject any and all Bids. Award, if made, shall be to the lowest responsible Bidder whose Bid is responsive to the invitation and is most advantageous to the Owner, in its sole and exclusive discretion, price and other factors considered. The Owner may reject a Bid as nonresponsive if the prices bid are materially unbalanced between the line items or subline items. A Bid is materially unbalanced when it is based on prices significantly less than the cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Owner even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing advance . The Owner also reserved the right to waive all information not involving price, time or changes in the Goods and Special Services, and to negotiate contract terms with Successful Bidder. Bid security shall be furnished in accordance with the Instructions to Bidders. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing Question Deadline 10/26/2023
Award
Water / Sewer
$6,833,058.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2023
April 24, 2024
Multiple Locations, Miller, SD
Related To This Project
Miller, SD
Bid Date: Mar 15 2024
Miller, SD
Bid Date: May 29 2024
Miller, SD
Bid Date: Apr 30 2024
Miller, SD
Bid Date: May 14 2024
Miller, SD
--
Miller, SD
Bid Date: Jul 02 2024
Miller, SD
Bid Date: Jul 02 2024
Miller, SD
Bid Date: Sep 06 2023
Miller, SD
Bid Date: Jul 21 2023
Miller, SD
Bid Date: Dec 12 2023
Miller, SD
Bid Date: Mar 16 2023
Miller, SD
Bid Date: May 17 2023
Miller, SD
Bid Date: Jan 11 2023
Britton, SD
Bid Date: Oct 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.