Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 9, 2024 at 8:00 PM
Updated August 10, 2024
Site work for a civil project in Miller, South Dakota. Completed plans call for site work for a water / sewer project.
Question Deadline 06/25/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows 1.01 The approximately 173,330 feet of 3-inch, 4-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings, appurtenances, replacement of one (1) existing prefabricated steel booster vault, rehabilitation of two (2) existing prefabricated steel booster vaults, and replacement of an existing tank weir and overflow pipe required by the Project Drawings, Specifications, and Contract Documents. The project is located in Hand, Jerauld, Buffalo, Hyde, and Hughes Counties in South Dakota. The Project consists of constructing approximately 173,330 feet of 3-inch, 4-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings, appurtenances, replacement of one (1) existing prefabricated steel booster vault, rehabilitation of two (2) existing prefabricated steel booster vaults, and replacement of an existing tank weir and overflow pipe required by the Project Drawings, Specifications, and Contract Documents. A Bid must be accompanied by Bid security made payable to Owner in the amount of ten (10) percent of Bidders maximum Bid Price General Condition or by a certified check. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Womens Business Enterprises (WBE) are explained in the contract documents. The goal for MBE is 1% of the total dollar value of the project. The goal for WBE is 4% of the total dollar value of the project. Owner reserves the right to reject any and all Bids.
Award
Water / Sewer
$7,996,190.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2024
August 2, 2024
Multiple Locations, Miller, SD
Related To This Project
Miller, SD
Bid Date: Jul 02 2024
Miller, SD
Bid Date: Apr 25 2025
Miller, SD
Bid Date: Aug 06 2025
Miller, SD
Bid Date: Oct 23 2025
Miller, SD
--
Miller, SD
Bid Date: Aug 26 2025
Miller, SD
Bid Date: Mar 19 2025
Miller, SD
Bid Date: May 14 2024
Miller, SD
Bid Date: Apr 30 2024
Miller, SD
Bid Date: May 29 2024
Miller, SD
Bid Date: Mar 15 2024
Miller, SD
Bid Date: Nov 02 2023
Miller, SD
Bid Date: Sep 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
