BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2024 at 8:00 PM

Updated August 10, 2024

Site work for a civil project in Miller, South Dakota. Completed plans call for site work for a water / sewer project.

Question Deadline 06/25/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows 1.01 The approximately 173,330 feet of 3-inch, 4-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings, appurtenances, replacement of one (1) existing prefabricated steel booster vault, rehabilitation of two (2) existing prefabricated steel booster vaults, and replacement of an existing tank weir and overflow pipe required by the Project Drawings, Specifications, and Contract Documents. The project is located in Hand, Jerauld, Buffalo, Hyde, and Hughes Counties in South Dakota. The Project consists of constructing approximately 173,330 feet of 3-inch, 4-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings, appurtenances, replacement of one (1) existing prefabricated steel booster vault, rehabilitation of two (2) existing prefabricated steel booster vaults, and replacement of an existing tank weir and overflow pipe required by the Project Drawings, Specifications, and Contract Documents. A Bid must be accompanied by Bid security made payable to Owner in the amount of ten (10) percent of Bidders maximum Bid Price General Condition or by a certified check. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Womens Business Enterprises (WBE) are explained in the contract documents. The goal for MBE is 1% of the total dollar value of the project. The goal for WBE is 4% of the total dollar value of the project. Owner reserves the right to reject any and all Bids.

Award

Water / Sewer

$7,996,190.00

Public - City

Site Work

51

31

8

11

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
10
Bidding Soon
216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

August 2, 2024

Project location map

Multiple Locations, Miller, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.