Site work and paving for a mixed-use development in Hood River, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Waterfront Storm Line Relocations Phase 2 Est. Value Notes: 1.3 Million- 2.5 Million The work to be done under this contract consists of connecting to an existing 36-inch RCP stub out on N 8th Street, installing 167 LF of 36-inch RCP north along N 8th Street to a new 72-inch manhole at the intersection of Portway Avenue and N 8th Street, then installing 100 LF of 36-inch RCP northwest along Portway Avenue to a new 72-inch manhole on Portway Avenue, then installing 315 LF of 36-inch RCP north on a parcel of land owned by the Port of Hood River to a new 60-inch manhole near the Columbia River, then installing 52 LF of 36-inch RCP to a new outfall in the Columbia River, and constructing a new outfall complete with flap gate, pre-cast concrete headwall, and rip rap bank armoring. The new outfall and portions of the new storm will be installed below the ordinary high water (OHW) elevation of the Columbia River. The work also includes a new multi-use path on the parcel of land owned by the Port of Hood River, installing one 48-inch manhole, a catch basin, a treatment catch basin, and one treatment vault. The treatment catch basin and vault will connect to an existing storm drain in N 8th Street. Associated work includes asphalt concrete pavement grind and inlay of N 8th Street and Portway Avenue; sidewalk, curb, driveway, and multi-use path restoration, landscaping, erosion control, and traffic control. The work may also include abandoning in-place 850 LF of 48-inch CMP storm drain line and a storm manhole by filling with low density cellular concrete, and associated work including installation of temporary pipe plugs or bulkheads, excavation, shoring, and dewatering. This inclusion of this work depends on the timing of storm drain system improvements with the City's wastewater treatment plant. The pipe abandonment work is included as a bid alternate item. The work is more particularly described in the project plans. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Inquiries concerning the contents of the plans, specifications and bidding documentsshould be directed to Randy Achziger, Project Manager for the City of Hood River The deadline for questions is October 19 at 5:00 p.m

Bid Results

Water / Sewer

$1,147,645.00

Public - City

Paving, Site Work

39

10

9

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
31
Bidding Soon
482
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

December 25, 2023

img_map_placeholder

Multiple Locations, Hood River, OR

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.