BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in San Martin, California. Completed plans call for the renovation of a municipal facility.

The Department of California Highway Patrol (CHP) is soliciting bids from firms that are able to provide Security Alarm System Installation Services. Bids must address all of the services described in Exhibit A entitled, Scope of Work that is included in the Proposed Agreement Forms/Exhibits section of this IFB. Exhibit A contains a detailed description of the services and work to be performed as a result of this IFB including those terms in the referenced exhibits. Questions Due October 27, 2023 at 5:00 p.m Security System Installation A. Install security alarm system in accordance with the National Fire Protection Association - (NFPA) 72, latest edition adopted by the State of California. B. Contractor will install six (6) Alarm Panels at each entrance to building. C. Contractor will install two (2) interior motion sensors in various location inside the office as identified during the bid walk. D. Contractor to install twenty-two (22) motion sensors on windows (1 per window) including the scale head. E. Contractor to install eight (8) exterior motion beam sensors to cover each bay door as identified during the bid walk (entrances and exits). F. Document and provide a list of the make, model and serial number of security and fire alarm equipment to Facilities Analyst. G. Contractor shall not lock-out system and system shall not be proprietary. 7. Alarm Monitoring A. Provide 24-hour monitoring of security alarm system through Underwriter Laboratory (UL) listed central monitoring station. B. Maintain UL certification of security alarm system in accordance with the NFPA 72, latest edition adopted by the State of California. C. Replace system batteries annually (cost to be included in monthly service fee). D. Document and provide a list of the make, model and serial number of security alarm equipment to Headquarters' Facilities Analyst. E. Provide annual testing of the security alarm system, including all devices. Test results to be sent to the on-site Facilities Coordinator as well as Coastal Division Analyst, Headquarters' Facilities Analyst at 601 North 7 th Street, Building B, Sacramento, CA 95811. F. Annually check all sensors and battery back-up. G. Contractor shall not lock-out system

Award

Municipal

$69,500.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
42
Bidding Soon
1,356
All Active Projects
598
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2023

December 1, 2023

img_map_placeholder

12000 S Valley Frwy, San Martin, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.